SCHOOLCRAFT PUMP STATION IMPROVEMENTS / MODIFICATIONS

Great Lakes Water Authority (GLWA) required the replacement of the existing obsolete variable controllers for the pumps and upgrades to the electrical distribution system at the Schoolcraft Pump Station. METCO addressed these needs by performing a comprehensive study with recommendation to replace the entire electrical distribution system supported with a redundant emergency generator system and… Continue reading SCHOOLCRAFT PUMP STATION IMPROVEMENTS / MODIFICATIONS

HAGGERTY PUMPING STATION

To ensure reliable water supply to the northwest communities of Oakland County, Great Lakes Water Authority (GLWA) had proposed to construct a new water pumping station with a firm capacity of 70 MGD, and a 10 MGD reservoir under Design- Build project delivery system. METCO was retained by GLWA as their ‘Oversight Consultant’ to prepare… Continue reading HAGGERTY PUMPING STATION

FRANKLIN PUMP STATION IMPROVEMENTS

Great Lakes Water Authority (GLWA) had decided to increase the capacity of this key Water Pumping Station by upsizing the existing pumps and other associated systems. To improve the reliability, DWSD also had decided to install state-of-art Instrumentation and Control System to monitor and control the Pump Station. METCO was engaged as Prime Consultant to… Continue reading FRANKLIN PUMP STATION IMPROVEMENTS