To ensure reliable water supply to the northwest communities of Oakland County, Great Lakes Water Authority (GLWA) had proposed to construct a new water pumping station with a firm capacity of 70 MGD, and a 10 MGD reservoir under Design- Build project delivery system.
METCO was retained by GLWA as their ‘Oversight Consultant’ to prepare proposal documents for Design/Build and to provide Owner ‘Oversight’ Consulting Services during the Bidding, Design and Construction phases of this project.
The key features of this project include:
- Land Acquisition Assistance
- MDEQ permit procurement
- Approximately 12,000 Sq. ft. of pumping station
- New two (2) – 13.6 KV DTE power feed
- Three (3) Line Pumps and two (2) Reservoir Pumps
- 10 million Gallon, above ground, precast concrete reservoir
- Three (3) 800 HP, medium voltage pulse width modulated Variable Frequency Drives
- 3,000 LF of 16-inch water main extension
- 5 MVA Primary Power Substation for the new facility
- Complete ‘Ovation’ based control system for remote/local control and monitoring of the pump station