Metco Services

Broward County Chiller Improvement Project

Teamed with Hazen & Sawyer, Metco was retained by Broward County Office of Environmental Services to perform a study to determine/confirm the cooling capacity and to develop the requirements for new chillers and pumps to replace the existing equipment at North Broward County Wastewater Plant Administration Building. Evaluate of the existing chilled water system capacity… Continue reading Broward County Chiller Improvement Project

Clintondale Pump Station Improvements

The Clintondale Pump Station (CPS), located in Clinton Township, Michigan, was constructed in 1973 as a temporary means of conveying sewerage collected within a portion of the Macomb County Wastewater Disposal District (MCWDD) to the Macomb Interceptor District where it then connects to the northern portion of the Detroit Water and Sewerage Department’s wastewater system.… Continue reading Clintondale Pump Station Improvements

Westerly Wastewater Treatment Plant Storage Tunnel and Dewatering Pump Station

The Westerly Storage Tunnel and Westerly Tunnel Dewatering Pump Station Projects (WST and WTDPS) to control overflows and protect the city of Cleveland’s roads from flooding, property damage and clean up Lake Erie. The scope of the project was to design an electrical system and instrumentation control for the pump station and other systems related… Continue reading Westerly Wastewater Treatment Plant Storage Tunnel and Dewatering Pump Station

Second Stage Aeration & Return Sludge Pump Station Improvements

METCO provided complete Electrical, MEP and Fire Protection Engineering services for this project. The scope of work includes all 480V and lower voltage electrical engineering services, heating, ventilation, air conditioning (HVAC), plumbing, fire protection engineering services, and specific permitting services necessary to develop and produce a detailed design package for the design, bidding package, and… Continue reading Second Stage Aeration & Return Sludge Pump Station Improvements

First Stage Aeration and Return Sludge Pump Station Improvements

The Southerly First Stage Activated Sludge System (FSAS) is a high-rate activated sludge system. The purpose of the FSAS is to remove CBOD and suspended solids from the primary settled effluent so that nitrification of ammonia may be accomplished in the Second Stage Activated Sludge System (SSAS). The process components of the First Stage include… Continue reading First Stage Aeration and Return Sludge Pump Station Improvements