Broward County Chiller Improvement Project

Teamed with Hazen & Sawyer, Metco was retained by Broward County Office of Environmental Services to perform a study to determine/confirm the cooling capacity and to develop the requirements for new chillers and pumps to replace the existing equipment at North Broward County Wastewater Plant Administration Building. Evaluate of the existing chilled water system capacity… Continue reading Broward County Chiller Improvement Project

Clintondale Pump Station Improvements

The Clintondale Pump Station (CPS), located in Clinton Township, Michigan, was constructed in 1973 as a temporary means of conveying sewerage collected within a portion of the Macomb County Wastewater Disposal District (MCWDD) to the Macomb Interceptor District where it then connects to the northern portion of the Detroit Water and Sewerage Department’s wastewater system.… Continue reading Clintondale Pump Station Improvements

Westerly Wastewater Treatment Plant Storage Tunnel and Dewatering Pump Station

The Westerly Storage Tunnel and Westerly Tunnel Dewatering Pump Station Projects (WST and WTDPS) to control overflows and protect the city of Cleveland’s roads from flooding, property damage and clean up Lake Erie. The scope of the project was to design an electrical system and instrumentation control for the pump station and other systems related… Continue reading Westerly Wastewater Treatment Plant Storage Tunnel and Dewatering Pump Station

Second Stage Aeration & Return Sludge Pump Station Improvements

METCO provided complete Electrical, MEP and Fire Protection Engineering services for this project. The scope of work includes all 480V and lower voltage electrical engineering services, heating, ventilation, air conditioning (HVAC), plumbing, fire protection engineering services, and specific permitting services necessary to develop and produce a detailed design package for the design, bidding package, and… Continue reading Second Stage Aeration & Return Sludge Pump Station Improvements

Sanitary Relief Sewer and Pavement Replacement Martin Road and 13-Mile Road

To comply with NPDES permit mandate of ZERO sanitary sewer overflow discharges, bypassing the Wastewater Treatment Plant, City of Warren retained the services of METCO to study their sewer collection system capacity and develop flow control solutions. As part of the study, METCO has identified the improvements including relief sewers and emergency overflow connections to… Continue reading Sanitary Relief Sewer and Pavement Replacement Martin Road and 13-Mile Road

Sanitary Relief Sewer and Pavement Replacement 10- and 12-Mile Roads

To comply with NPDES permit mandate of “ZERO” sanitary sewer overflow discharges, bypassing the Wastewater Treatment Plant, City of Warren retained the services of METCO to study their sewer collection system capacity and develop flow control solutions. As part of the study, METCO has identified the improvements including relief sewers and emergency overflow connections to… Continue reading Sanitary Relief Sewer and Pavement Replacement 10- and 12-Mile Roads

Supplement Wet Weather Investigation of Upper Rouge Outfalls

DWSD retained METCO to conduct wet weather investigation at twelve (12) Upper Rouge Outfalls to verify CSO discharge frequencies and volumes and to validate the data currently available from the DWSD metering system. It included both field investigation and flow monitoring for 12 months. Specifically, METCO provided the following services: – Review the existing drawings… Continue reading Supplement Wet Weather Investigation of Upper Rouge Outfalls

Sanitary Sewer Overflow Elimination Program

To comply with NPDEs permit mandate of sanitary sewer overflow discharges, bypassing the Wastewater Treatment Plant, City of Warren retained the services of METCO to study their sewer collection system capacity and develop flow control solutions. In conjunction with the permit requirements, City of Warren also stipulated that the flow control solutions should address their… Continue reading Sanitary Sewer Overflow Elimination Program

Rouge River Pilot CSO Facility at Outfall 072 Puritan East

To comply with their NPDES Permit requirements, Detroit Water and Sewerage Department (DWSD) retained the services of METCO to study and design a CSO Control Facility at one of the Rouge River Outfall/Puritan (072). METCO assisted DWSD in the evaluation and selection of this outfall as the location for the pilot control facility. This facility… Continue reading Rouge River Pilot CSO Facility at Outfall 072 Puritan East

Hubbell-Southfield CSO Facility Rehabilitation

To comply with their NPDES Permit requirements, Detroit Water and Sewerage Department (DWSD) retained the services of METCO to perform a comprehensive condition survey and design solutions for major rehabilitation of the existing architectural, structural, process and control systems at Hubbell-Southfield CSO Control Facility. METCO had designed the following major upgrades of each system in… Continue reading Hubbell-Southfield CSO Facility Rehabilitation