Metco Services

SCHOOLCRAFT PUMP STATION IMPROVEMENTS / MODIFICATIONS

Great Lakes Water Authority (GLWA) required the replacement of the existing obsolete variable controllers for the pumps and upgrades to the electrical distribution system at the Schoolcraft Pump Station. METCO addressed these needs by performing a comprehensive study with recommendation to replace the entire electrical distribution system supported with a redundant emergency generator system and… Continue reading SCHOOLCRAFT PUMP STATION IMPROVEMENTS / MODIFICATIONS

HAGGERTY PUMPING STATION

To ensure reliable water supply to the northwest communities of Oakland County, Great Lakes Water Authority (GLWA) had proposed to construct a new water pumping station with a firm capacity of 70 MGD, and a 10 MGD reservoir under Design- Build project delivery system. METCO was retained by GLWA as their ‘Oversight Consultant’ to prepare… Continue reading HAGGERTY PUMPING STATION

SYSTEM – WIDE HYDRAULIC MODELING FOR DETROIT WATER SYSTEM

GLWA retained METCO to update their Water Distribution System Hydraulic Model to integrate with their GIS Geocentric Database and SCADA System. The Project also requires developing the updated model utilizing “Info water” platform. The updated GIS were aligned and calibrated with model database to develop a GIS centric model with the capability to integrate with… Continue reading SYSTEM – WIDE HYDRAULIC MODELING FOR DETROIT WATER SYSTEM

FRANKLIN PUMP STATION IMPROVEMENTS

Great Lakes Water Authority (GLWA) had decided to increase the capacity of this key Water Pumping Station by upsizing the existing pumps and other associated systems. To improve the reliability, DWSD also had decided to install state-of-art Instrumentation and Control System to monitor and control the Pump Station. METCO was engaged as Prime Consultant to… Continue reading FRANKLIN PUMP STATION IMPROVEMENTS

READY ROAD TO WILL CARLTON ROAD WATER MAIN EXTENSION

In order to mitigate the current low water pressure in some of the Downriver communities during the peak summer months, DWSD proposed to construct Eleven (11) miles of transmission line starting at the intersection of I-75 and Ready Road to Sumpter Township. METCO was tasked to perform a comprehensive Hydraulic Study to determine the size… Continue reading READY ROAD TO WILL CARLTON ROAD WATER MAIN EXTENSION

Published
Categorized as Water Mains

STEAM, CONDENSATE RETURN AND COMPRESSED AIR PIPING IMPROVEMENTS AT SPRINGWELLS WATER TREATMENT PLANT

METCO was retained by the Great Lakes Water Authority (GLWA) to provide Professional Engineering Services to develop design documents for replacement of all existing steam, condensate, compressed air, and natural gas system piping and other auxiliary system, on Plant-Wide basis. In addition to construction administration services, METCO is responsible to provide Resident Project Representative services… Continue reading STEAM, CONDENSATE RETURN AND COMPRESSED AIR PIPING IMPROVEMENTS AT SPRINGWELLS WATER TREATMENT PLANT

SPRINGWELLS WATER TREATMENT PLANT FILTER REHABILITATION AND AUXILIARY FACILITIES IMPROVEMENTS

The project involves rehabilitating the 1958 filters and other auxiliary facilities improvements at several process areas within the Springwells Water Treatment Plant. The auxiliary facility improvements involved multiple disciplinary tasks. METCO, in association with CDM, was engaged to provide Engineering Services required to develop Preliminary Design Report, Detailed Design Documents and Construction Administration Services for… Continue reading SPRINGWELLS WATER TREATMENT PLANT FILTER REHABILITATION AND AUXILIARY FACILITIES IMPROVEMENTS

NORTHEAST WATER TREATMENT PLANT – CRITICAL PUMP STATION IMPROVEMENTS

GLWA (Owner) required several critical improvements to the High-Lift and Low-Lift Pumping Systems at the Northeast Water Treatment Plant to improve operational efficiency. In order to expeditiously execute the improvements, the GLWA selected a Design-Build project delivery system. METCO functioned as the “Engineer-of-Record” for the Design/Build team was responsible for the Design and Design-Construction Coordination… Continue reading NORTHEAST WATER TREATMENT PLANT – CRITICAL PUMP STATION IMPROVEMENTS

ADDITION OF VARIABLE FREQUENCY DRIVES FOR THREE HIGH LIFT PUMPS AT LAKE HURON WATER TREATMENT PLANT

In order to accomplish an enhanced level of operation flexibility, Great Lakes Water Authority (GLWA) had identified three (3) High Lift Pumps at their Lake Huron WTP to be fitted with Variable Frequency Drives (each rated for 5500 HP at 13.2 voltage level). The proposed VFD system is the largest of its kind installed in… Continue reading ADDITION OF VARIABLE FREQUENCY DRIVES FOR THREE HIGH LIFT PUMPS AT LAKE HURON WATER TREATMENT PLANT